The Kraken Sea Jacks Vessel

“The challenge to erect and demobilise this platform within a 12 hour window was successfully executed by our team of highly skilled and experienced staff.”

Kraken Sea Jacks Vessel
“The challenge to erect and demobilise this platform within a 12 hour window was successfully executed by our team of highly skilled and experienced staff.”

“The additional walkway and steelwork on the Kraken Sea Jacks Vessel was completed on the B52 blade racks for the Walney 1 and 2 bow installation.”

Kraken Sea Jacks Vessel
“The additional walkway and steelwork on the Kraken Sea Jacks Vessel was completed on the B52 blade racks for the Walney 1 and 2 bow installation.”

The Kraken Sea Jacks Vessel was inspected and repaired with minimal downtime

Kraken Sea Jacks Vessel
Steel walkways to be fabricated and fitted around the blade racking